affaan-m/ECC

production-scheduling

日本語翻訳:このファイルは production-scheduling 用の日本語翻訳が必要です

49Collecting
See how to use itView GitHub source
npx skills add https://github.com/affaan-m/ECC --skill "docs/ja-JP/skills/production-scheduling"
Automated source guide

Source checked Jul 28, 2026·Refresh due Oct 26, 2026

Reorganized from the pinned upstream SKILL.md

Turn production-scheduling's source instructions into a guide you can follow

According to the pinned SKILL.md from affaan-m/ECC: このファイルの翻訳は実装中です。英語版は元のスキルファイルを参照してください。

npx skills add https://github.com/affaan-m/ECC --skill "docs/ja-JP/skills/production-scheduling"
Check the pinned source

Best fit

  • 日本語翻訳:このファイルは production-scheduling 用の日本語翻訳が必要です

Bring this context

  • A concrete task that matches the documented purpose of production-scheduling.
  • The files, examples, or context the task depends on.
  • Your constraints, target environment, and definition of done.

Expected outputs

  • A result that follows the pinned production-scheduling instructions.
  • A concise record of assumptions, inputs used, and unresolved questions.
  • A final check against the source workflow and relevant permission signals.

Key source sections

Read production-scheduling through these 1 source sections

Sections are extracted automatically from the pinned SKILL.md and link back to the source.

01

Read the pinned source

Review the complete production-scheduling SKILL.md because no stable section structure was detected automatically.

SKILL.md · production-scheduling
Confirm the task matches the documented purposeIdentify required inputs and constraints

SkillSignal prompt templates

Provide the task, context, and acceptance criteria

These prompts were written by SkillSignal from the source structure; they are not upstream text.

Task-start prompt

Confirm source fit, inputs, and outputs before acting.

Use production-scheduling to help me with: [specific task]. Context: [files, data, or background]. Constraints: [environment, scope, and prohibited actions]. Before acting, check the pinned SKILL.md and explain which sections apply, what inputs are still missing, and what you will deliver.

Source-guided execution

Make the Agent explicitly follow the key extracted sections.

Apply the pinned production-scheduling source to [task]. Pay particular attention to these source sections: the pinned SKILL.md. Preserve the important decision at each step. Mark facts not covered by the source as “needs confirmation” instead of inventing them. Then verify the result against my acceptance criteria: [criteria].

Result-review prompt

Check omissions, permissions, and source drift before delivery.

Review the current production-scheduling result: (1) does it satisfy the original task; (2) were any applicable steps or limits in the pinned SKILL.md missed; (3) did it perform any unauthorized file, command, network, or data action; and (4) which conclusions remain unverified? List issues first, then fix only what the source or user authorization supports.

Output checklist

Verify each item before delivery

The task matches the purpose documented in the SKILL.md.

Inputs, constraints, and acceptance criteria are explicit.

Unverified facts, compatibility, and outcome claims are clearly marked.

Any file, command, network, or data action has been reviewed.

Choose a different workflow

When another Skill is the better fit

production-scheduling

Codified expertise for production scheduling, job sequencing, line balancing, changeover optimization, and bottleneck resolution in discrete and batch manufacturing. Informed by production schedulers with 15+ years experience. Includes TOC/drum-buffer-rope, SMED, OEE analysis, disruption response frameworks, and ERP/MES interaction patterns. Use when scheduling production, resolving bottlenecks, optimizing changeovers, responding to disruptions, or balancing manufacturing lines.

A separate implementation from affaan-m/ECC; compare its source, maintenance signals, and permission requirements.

Open source detail

production-scheduling

为离散和批量制造中的生产调度、作业排序、产线平衡、换模优化和瓶颈解决提供编码化专业知识。基于拥有15年以上经验的生产调度师的知识。包括约束理论/鼓-缓冲-绳、快速换模、设备综合效率分析、中断响应框架以及企业资源计划/制造执行系统交互模式。适用于调度生产、解决瓶颈、优化换模、应对中断或平衡制造产线时。

A separate implementation from affaan-m/ECC; compare its source, maintenance signals, and permission requirements.

Open source detail

ab-testing

When the user wants to plan, design, or implement an A/B test or experiment, or build a growth experimentation program. Also use when the user mentions "A/B test," "split test," "experiment," "test this change," "variant copy," "multivariate test," "hypothesis," "should I test this," "which version is better," "test two versions," "statistical significance," "how long should I run this test," "growth experiments," "experiment velocity," "experiment backlog," "ICE score," "experimentation program

A separate implementation from coreyhaines31/marketingskills; compare its source, maintenance signals, and permission requirements.

Open source detail

FAQ

What does production-scheduling do?

このファイルの翻訳は実装中です。英語版は元のスキルファイルを参照してください。

How do I start using production-scheduling?

The catalog detected this source-specific install command: npx skills add https://github.com/affaan-m/ECC --skill "docs/ja-JP/skills/production-scheduling". Inspect the command and pinned source before running it.

Which Agent platforms does it declare?

No dedicated Agent platform is declared in the pinned source record.

Repository stars
234,327
Repository forks
35,711
Quality
49/100
Source repository last pushed

Quality breakdown

Based on traceable docs and repository signals; stars are not treated as quality.

49/100
Documentation7/30
Specificity10/25
Maintenance20/20
Trust signals12/25

Compare before choosing

Related Agent Skills and source variants

These links are selected from shared tasks, functions, stacks, platforms, and same-name variants. Compare the source owner, documentation, permissions, and maintenance signals.

production-scheduling by affaan-m

Codified expertise for production scheduling, job sequencing, line balancing, changeover optimization, and bottleneck resolution in discrete and batch manufacturing. Informed by production schedulers with 15+ years experience. Includes TOC/drum-buffer-rope, SMED, OEE analysis, disruption response frameworks, and ERP/MES interaction patterns. Use when scheduling production, resolving bottlenecks, optimizing changeovers, responding to disruptions, or balancing manufacturing lines.

production-scheduling by affaan-m

为离散和批量制造中的生产调度、作业排序、产线平衡、换模优化和瓶颈解决提供编码化专业知识。基于拥有15年以上经验的生产调度师的知识。包括约束理论/鼓-缓冲-绳、快速换模、设备综合效率分析、中断响应框架以及企业资源计划/制造执行系统交互模式。适用于调度生产、解决瓶颈、优化换模、应对中断或平衡制造产线时。

ab-testing by coreyhaines31

When the user wants to plan, design, or implement an A/B test or experiment, or build a growth experimentation program. Also use when the user mentions "A/B test," "split test," "experiment," "test this change," "variant copy," "multivariate test," "hypothesis," "should I test this," "which version is better," "test two versions," "statistical significance," "how long should I run this test," "growth experiments," "experiment velocity," "experiment backlog," "ICE score," "experimentation program

churn-prevention by coreyhaines31

When the user wants to reduce churn, build cancellation flows, set up save offers, recover failed payments, or implement retention strategies. Also use when the user mentions 'churn,' 'cancel flow,' 'offboarding,' 'save offer,' 'dunning,' 'failed payment recovery,' 'win-back,' 'retention,' 'exit survey,' 'pause subscription,' 'involuntary churn,' 'people keep canceling,' 'churn rate is too high,' 'how do I keep users,' or 'customers are leaving.' Use this whenever someone is losing subscribers o

design-intelligence by event4u-app

Grounded design brief from the adopted corpus — style, WCAG-checked color tokens, typography, layout pattern, anti-patterns. Use on ui-design-brief or any which-style/palette/font/chart decision.

View original Skill.mdThis page is parsed directly from the repository SKILL.md without editorial rewriting. Collected: Jul 28, 2026 · about 1 min

production-scheduling - 日本語翻訳進行中

このファイルの翻訳は実装中です。英語版は元のスキルファイルを参照してください。

詳細は:D:/tmp/everything-claude-code/skills/production-scheduling/SKILL.md

Source repo
affaan-m/ECC
Skill path
docs/ja-JP/skills/production-scheduling/SKILL.md
Commit SHA
4e973d3eaf92
Repository license
MIT
Data collected